Just to be certain that have actually accomplished some things over the past several weeks, here is a list of the jobs that I set out to complete in the garage before I would be allowed (by my lovely wife) to order my RV 8 tail kit from Van's:
  • Add a new 20 amp electrical circuit to isolate the air compressor from the rest of the lights and outlets in the garage - no more dimming lights when the compressor kicks on!
  • Added 3 new outlets on the new electrical circuit, and extended 3 more outlets from an existing circuit, all paced strategically above the workbenches.
  • Rewired an incorrectly wired three way switch to make it work like a true three way switch ( was actually a 2-way,three-way switch.....too hard to explain!)
  • Built 2 seven-foot long work benches
  • Added a large utility storage shelf unit - 2ft x 4ft x 6ft tall.
  • Put up peg board sections above work benches
  • Hung 2 new shop lights above each work bench
  • Removed all traces of old aluminum wiring from the garage. There were 2 very long runs of very large aluminum wiring very high in the rafters that had to be removed and replaced with copper wiring.
  • Rewired and reposition a phone line.
It may not seem like much, but I am absolutely exhausted right now!