Well, it felt like a million holes at least. Tonight I worked on the Main wing spar to get the remaining main wing spar flange holes countersunk for the dimples in the main wing skins, which I am going to start on tomorrow. Yesterday I also edge-deburred 3 of the 4 sides of the top outer wing skin. I also filed away those pesky points on the edge of the skin where it separates from the metal sheet that it is cut from on the CNC machine at the factory. These are potential sources for stress risers in the skin that could lead to cracks and fatigue. I think some builders leave these as is because they probably don't even realize they are there. I can feel them with my finger. Chalk that up to years of building plastic models where you had to remove each part from the plastic tree on which each part is molded. You had to clean up those edges to.
SO now most of the rivet holes in main wing spar flanges have been countersunk. I also called Vans today to ask about the corner of the skins that overlap when you form a lap joint with the inner and outer wing skins.This corner gets filed down so that the edges of the overlapping wing skins butt up flush with the fuel tank skin. I needed to find out if I am still dimpling those skins where they get thinned down quite a bit. The answer was yes.
Now for more about Dan's method to "remove" the LE assembly, which caused me such grief the other day. In fairness to Dan, when he came up with his idea to properly position the tank baffle to ensure that the skins all butt up to each other properly, which Van's instructions would NOT guarantee, he was experimenting with this for the first time. Dan did his Right wing first, followed by his left wing.
What I found out after I read ahead in his build log and reviewed how he did this for the left wing, was that he DID detach the clecoes holding the 408 LE rib and joiner plate to remove the LE from the wing spar while still leaving the fuel tank firmly attached to the wing spar. So the problem was that the first time he did this on his right wing, he did not post anything about that crucial step in this process. However, for his left wing, he not only wrote about this critical step, but he also took a picture of it.
SO as with all experiments, you learn a bit more each time you repeat the process. Had I been smart enough to read ahead to his left wing assembly, I would have seen this and not tried to destroy my LE like an idiot.
I also wanted to mention that Vans was absolutely no help in this department, but not for the reasons I mentioned in an earlier post. After I re-read their instructions today, they basically have you attach the LE to the wing spar, and then they tell you to laeve the LE there and "get to work on the fuel tank." then after you do all fuel tank work, you don't see another word about the Le until AFTER ALL of the fuel tanks assembly is complete. I mean sealed, riveted - COMPLETE. Then the next thing they tell you is to rivet the LE in the cradle OFF the WING - but they NEVER tell you when to 'remove the LE from the wing spar after you left it there. typical Vans instructions severely lacking in critical points of the build. Ridiculous.SO if you followed their method, you would still end up scratching your head about how and when to remove that LE assembly.
Lastly for tonight, before I can start riveting the LE together, I have to perform the final steps to make the cutout of the LE skin. I called Jim Elliot to discuss this with him again. The main questions were if I should leave enough outer skin in between the ribs of the bay in question that I will be cutting so that another line of rivets could secure the outer skin to the subskin to secure that area from bending or twisting and possibly cracking. The answer was yes, and use the same rivet pitch as was done on the rivets that attach the skin to the rib flanges and the subskin. SO I will be leaving about 1.5 inches or so of extra outer skin next to each rib to provide enough room for a line of rivets relatively close to the existing rivets that attach the skin to the ribs and the subskin. And then there will be enough rove to install a line of K1100-8 nut plates along the sides as well. this is consistent with information about this sort of things in AC43-14 for lap joint types of "repairs" which is similar to what I would be doing.
I also took a closer look at the lap joint or splice joint that is used to join the outer and inner wing skins, and noted the spacing and rivet pattern that they used for that area, again which is very similar to what I will be doing with the LE. SO this gave me something to measure and to look at so I could see how this setup might look when I do it on both sides of the skin next to each rib.
The next decision was what type of radius to use for the rear part of the cutout. After using the 1/2 inch radius or the new access panel, I think I am going to stick with that for the transition of the cutout from along the sides to the rear portion on the top and bottom of the outer skin. this makes a nice large transition that won't load up the corners as much as a smaller 1/4 inch or 1/8th inch radius would. It also makes for a nice wide round corner to fit the removable LE skin up against when you mount it the LE.
SO I think I am very close to making some final measurements for cut lines and rivet lines, spacing adn patterns,as well as the number of nut plates and screws to use. I have also decided that the cutout will go back as far as the 4th or 5th rivet along each rib. Since the RV wing is very thick wing plan form, this means that the size of the removable LE that I will be making is still going to seem pretty large as it wraps around the subskin from top to bottom. And there is something to consider about how cutting away a smaller size is safer because I can always make it larger if necessary. But it is impossible to go the other way. If I remove too much, I can;t get it back. So this is that last nerve racking decision to make to determine the ultimate size of the removeable LE.
This is also where I had said that I would make a mock up of the assembly to get a feel for how this go, but the fact of the matter is that I think I have planned and researched this whole thing out to the point where I feel pretty comfortable with all the remaining steps that need to be completed to make this monster idea into a reality.
Anywhoo, I'm rambling about all this again just to make sure I capture it in writing. When I am ready, and the layout is drawn out and measured, it will be time to remove the 2 ribs and the subskin for one last final time, and make the cuts in the outer skin and finish trimming up the subskin to its final form.
KPR
Wednesday, October 4, 2017
Tuesday, October 3, 2017
Almost ruined the LE yesterday....
This is where I get to rant once gain about those that do not provide enough information to ensure that things get done properly. As a result of this lack of information, and my own shear stupidity, I almost ended up destroying my inboard leading edge rib while trying to get the damn thing off the wing spar per the instructions you get from all these web sites using the "Checkoway" method.Well, now that I have experienced the "Checkoway" method first hand, which actually mirrors a similar useless instruction from Vans, I am here to tell you that for this little part of the procedure - the method sucks!
To understand this, I'll review what is going on here.
1. You are trying to mate the LE skin to the fuel tank skin and the top wing skins to ensure that all the skins have a nice fit up against each other with no gaps, and that the joiner plate is properly positioned for match drilling the screw holes in the fuel tank skin to the joiner plate extension from the LE.
2. This means that the LE is clecoed to the wing spar nice and tight, and the fuel tank is clecoed to the wing spar using the #30 clecoes in the fuel tank skin holes through the nut plates for the screw holes - also nice and tight.
3. The other reason why you want this joint to be tight and straight is that there is a joiner plate that connects the fuel tank skin to the LE skin, and there is not a lot of room on this joiner plate for the nutplates and #8 screw holes. So the holes for the screws and nutplates for that thing also have to be drilled in just the right place.
4. Once you match drill the #30 holes in the fuel tank skin and the joiner plate of the LE, the Checkoway instruction tells you to "REMOVE the Leading Edge from the wing spar."
5. The other important thing to note is that the fuel tank is supposed to remain fully attached to the wing spar while you "remove" the LE assembly so that you can properly position the rear baffle plate and drill all the rib to baffle to Z bracket holes, starting with the inboard rib, followed by the outboard rib. SO you can't remove any clecoes or anything else from the now-secured fuel tank to allow you to remove the LE, or you defeat the purpose of mounting everything together in the first place.
6. The joiner plate extension sits UNDERNEATH the fuel tank skin. So with everything clecoed together you cannot just lift the LE assembly straight up off the wing spar with the fuel tank still secured to the wing spar, as the joiner plate will interfere with that.
SO I did all the above, and it was working out rather well. Then I removed all the clecoes holding the LE to the wing spar, and tried to "remove it from the wing spar" per the instructions. The problem was that something was not "letting go" as I tried to remove it, and at first it felt like a cleco was still holding it to the wing spar. Three full repeated checks later, I confirmed there was NO cleco holding the LE to the wing spar. SO why was the LE hanging up, and on what?
Like an absolute idiot, I decided that maybe I just need to pull harder because the fit of the LE joiner plate to the fuel tank was very tight. The reality, and the truth to this situation, is that in order to get the LE off the wing spar you have to slide it out toward the wing-tip side of the spar, to try to clear the joiner plate from under the fuel tank skin. Then you should be able to lift it straight up and out. Well, all these idiots seem to forget to tell you that their are two problems with this:
1. The edges of the rear flanges of the LE ribs sitting flush against the wing spar web when the LE assembly is on the wing spar sit VERY CLOSE to the shop heads of the forward flanges of the main wing ribs that are already riveted to the wing spar web.
2. In order to slide the LE toward the wing tip part of the spar, you must lift the LE skins up and over your support bracket that holds the wing spar onto the wing stand. This is because the LE skins extend downward past the mounting stand bracket so they can be attached to the wing spar flange along each flange of the wing spar. This puts the LE at an angle, which unfortunately results in the inboard rib flanges of the LE digging into the wing spar and angled toward the shop heads of the rivets even further.
At one point I pulled so hard that "something" finally gave way. Upon removing the LE assembly I found out what that "something" was. One corner of the rear flange of my most-inboard 408 rib had been folded back to about 120 degrees, as it got caught on the edge of one of the shop heads of the main wing rib rivets as I tried to pull it away from the secured fuel tank assembly harder and harder. This also distorted several bends in that entire rib flange, and even bent the rib web slightly out of alignment.
I think I was able to repair the rib by bending everything back in place as much as possible, but Lord only knows what may have happened to my already enlarged rivet holes for that rib, subskin, and outer skin with all that tugging that I did.. I used pliers and my metal straightening/bending tool to try to flatten out the edge of the rear rib flange. It did not crack as far as I an tell, but it was obviously severely stressed.
I just can't believe how stupid I was. Note to self - if the part won't move, it is hung up on something! Stop what you are doing and figure out what it is hung up on, and then figure out how to solve the problem intelligently.
SO here is that "something else" that NOBODY seems to mention in their builders logs or posts to their blogs when they get to this step. I submit this in the event that my stupidity might prevent another builder from making the same mistake that I did.
I reasoned that "normal builders" that only use the small 1.5 inch wide joiner strip per the plans, end up with some "give" in the 1.5 inch wide strip when they lift up on the LE and start sliding it off of the wing spar. This also allows the rear flanges of that first LE rib to lift up high enough to clear the shop heads from the main wing spar rivets as it starts to move away from the fuel tank, and off it comes. OR.......
What probably REALLY happens is that they remove the clecoes that hold the first inboard 408 rib to the LE skin and the joiner strip, and this frees up the entire LE assembly so that it can be lifted STRAIGHT UP instead of OUTWARD. Then the joiner strip can be removed from the fuel tank, and all is well.
But try to find that little blurb in someone's build log - it never exists, and why that is, I will never know.
SO in my case, I would have needed to remove clecoes from both inboard ribs to release the LE skin from the modified joiner plate/subskin that spans the distance of both of those ribs (12 inches wide). Had I done that, all of this would have been avoided, and I would not be stressing further over the integrity of this stupid part of mine.
I'm pretty frustrated over my own stupidity, and I'm absolutely mystified about how others that work on this phase of the build do not comment on any difficulty with removing the LE assembly after the fuel tank is secured to the wing spar. I guess they must be smarter than me.
I think I escaped this stupid mistake without too much damage, but I won't know for certain until the time comes to rivet the LE to the wing spar for the final time.
On a more positive note, I did some more work on the fuel tank baffle and Z bracket rivet holes tonight, but I'll update that work tomorrow with some pics.
To understand this, I'll review what is going on here.
1. You are trying to mate the LE skin to the fuel tank skin and the top wing skins to ensure that all the skins have a nice fit up against each other with no gaps, and that the joiner plate is properly positioned for match drilling the screw holes in the fuel tank skin to the joiner plate extension from the LE.
2. This means that the LE is clecoed to the wing spar nice and tight, and the fuel tank is clecoed to the wing spar using the #30 clecoes in the fuel tank skin holes through the nut plates for the screw holes - also nice and tight.
3. The other reason why you want this joint to be tight and straight is that there is a joiner plate that connects the fuel tank skin to the LE skin, and there is not a lot of room on this joiner plate for the nutplates and #8 screw holes. So the holes for the screws and nutplates for that thing also have to be drilled in just the right place.
4. Once you match drill the #30 holes in the fuel tank skin and the joiner plate of the LE, the Checkoway instruction tells you to "REMOVE the Leading Edge from the wing spar."
5. The other important thing to note is that the fuel tank is supposed to remain fully attached to the wing spar while you "remove" the LE assembly so that you can properly position the rear baffle plate and drill all the rib to baffle to Z bracket holes, starting with the inboard rib, followed by the outboard rib. SO you can't remove any clecoes or anything else from the now-secured fuel tank to allow you to remove the LE, or you defeat the purpose of mounting everything together in the first place.
6. The joiner plate extension sits UNDERNEATH the fuel tank skin. So with everything clecoed together you cannot just lift the LE assembly straight up off the wing spar with the fuel tank still secured to the wing spar, as the joiner plate will interfere with that.
SO I did all the above, and it was working out rather well. Then I removed all the clecoes holding the LE to the wing spar, and tried to "remove it from the wing spar" per the instructions. The problem was that something was not "letting go" as I tried to remove it, and at first it felt like a cleco was still holding it to the wing spar. Three full repeated checks later, I confirmed there was NO cleco holding the LE to the wing spar. SO why was the LE hanging up, and on what?
Like an absolute idiot, I decided that maybe I just need to pull harder because the fit of the LE joiner plate to the fuel tank was very tight. The reality, and the truth to this situation, is that in order to get the LE off the wing spar you have to slide it out toward the wing-tip side of the spar, to try to clear the joiner plate from under the fuel tank skin. Then you should be able to lift it straight up and out. Well, all these idiots seem to forget to tell you that their are two problems with this:
1. The edges of the rear flanges of the LE ribs sitting flush against the wing spar web when the LE assembly is on the wing spar sit VERY CLOSE to the shop heads of the forward flanges of the main wing ribs that are already riveted to the wing spar web.
2. In order to slide the LE toward the wing tip part of the spar, you must lift the LE skins up and over your support bracket that holds the wing spar onto the wing stand. This is because the LE skins extend downward past the mounting stand bracket so they can be attached to the wing spar flange along each flange of the wing spar. This puts the LE at an angle, which unfortunately results in the inboard rib flanges of the LE digging into the wing spar and angled toward the shop heads of the rivets even further.
At one point I pulled so hard that "something" finally gave way. Upon removing the LE assembly I found out what that "something" was. One corner of the rear flange of my most-inboard 408 rib had been folded back to about 120 degrees, as it got caught on the edge of one of the shop heads of the main wing rib rivets as I tried to pull it away from the secured fuel tank assembly harder and harder. This also distorted several bends in that entire rib flange, and even bent the rib web slightly out of alignment.
I think I was able to repair the rib by bending everything back in place as much as possible, but Lord only knows what may have happened to my already enlarged rivet holes for that rib, subskin, and outer skin with all that tugging that I did.. I used pliers and my metal straightening/bending tool to try to flatten out the edge of the rear rib flange. It did not crack as far as I an tell, but it was obviously severely stressed.
I just can't believe how stupid I was. Note to self - if the part won't move, it is hung up on something! Stop what you are doing and figure out what it is hung up on, and then figure out how to solve the problem intelligently.
SO here is that "something else" that NOBODY seems to mention in their builders logs or posts to their blogs when they get to this step. I submit this in the event that my stupidity might prevent another builder from making the same mistake that I did.
I reasoned that "normal builders" that only use the small 1.5 inch wide joiner strip per the plans, end up with some "give" in the 1.5 inch wide strip when they lift up on the LE and start sliding it off of the wing spar. This also allows the rear flanges of that first LE rib to lift up high enough to clear the shop heads from the main wing spar rivets as it starts to move away from the fuel tank, and off it comes. OR.......
What probably REALLY happens is that they remove the clecoes that hold the first inboard 408 rib to the LE skin and the joiner strip, and this frees up the entire LE assembly so that it can be lifted STRAIGHT UP instead of OUTWARD. Then the joiner strip can be removed from the fuel tank, and all is well.
But try to find that little blurb in someone's build log - it never exists, and why that is, I will never know.
SO in my case, I would have needed to remove clecoes from both inboard ribs to release the LE skin from the modified joiner plate/subskin that spans the distance of both of those ribs (12 inches wide). Had I done that, all of this would have been avoided, and I would not be stressing further over the integrity of this stupid part of mine.
I'm pretty frustrated over my own stupidity, and I'm absolutely mystified about how others that work on this phase of the build do not comment on any difficulty with removing the LE assembly after the fuel tank is secured to the wing spar. I guess they must be smarter than me.
I think I escaped this stupid mistake without too much damage, but I won't know for certain until the time comes to rivet the LE to the wing spar for the final time.
On a more positive note, I did some more work on the fuel tank baffle and Z bracket rivet holes tonight, but I'll update that work tomorrow with some pics.
Sunday, October 1, 2017
Continuing with Dimpling and CounterSinking holes for the LE
Starting with some pics from the dimpling of the LE outer skin mentioned in my previous post:
This was a bit of a chore that required me to clear away a large area of the work bench to be able to maneuver it so that each hole could be dimpled. This was complicated for me because my dimpling table is on the bench, the back side of which is right up against the wall. So this restricts my ability to position the parts and also to position myself so that I can hold and hit the ram with both hands to properly form each dimple. Since space is restricted I found that I have to get very creative about how I position myself to be able to set these dimples. Translated another way, it means that I have to bend my body in some very unnatural and uncomfortable ways to be able to do this.
SO I can tell you right now that I am not looking forward to dimpling the larger outer wing skins, and I may go ahead and try to set up a level method on the garage floor, away from the work benches, just so it will be easier to move both myself and the sink around on the dimpling table without risking throwing my back out of whack. Not fun.
The next 2 pics show my re-assembly of the LE after I got most of the skin dimpled, except for the several holes that I missed match drilling as I mentioned in my previous post. I started reassembling by clecoing the subskin to the outer skin first, just to try to align the dimples. then I decided to reattach the center ribs first, followed by the outer ribs and then finally the inner ribs. I had numbered each rib with a piece of tape to ensure that each rib was reassembled in its proper place. (Read on for a humerous blunder that I made regarding the rib position).
Some complications arose:
1. I discovered that I had not dimpled two of the forward most holes in the subskin - I just missed them after I finally decided to dimple all the holes. So I had to detach the subskin, dimple the holes, and reattach it again - more wasted time.
2. After the LE was completely reassembled, it was time to put it back on the wing spar so I could match drill the remaining skin holes to the wing spar that I missed, and to match drill the W-423 joiner plate holes for the nut plates between the fuel tank and the LE. The only problem was that when I tried to reattach the LE rear rib flanges to the main wing spar web, I would not get the clecoes inserted into the end-most holes in the #3 rib position.
I removed the LE several times trying to figure out what was wrong. the first time I thought it was excess primer in the holes, so I ran a #30 drill bit through each rib hole.Then I put it back on the wing spar, but still had the same problem. SO I took it off again. This time I noticed that one of the rear rib flanges had 2 extra holes in it, and I remembered that one of these ribs had rear flanges that were pre-drilled from the factory, but they must have been a different hole pattern for an RV-6 or RV-7. SO for the RV-8, they tell you to match drill 2 new holes in this rib and to disregard the other holes.
It was then that I realized that I must not have the right rib in the right location. And sure enough, when I checked the rivet hole pattern for each rib flange on the main wing spar, that was exactly the problem. The funny thing is that I think I messed this up clear back to when I primed each of the LE ribs. I remember picking them up from my priming table when I was all done, and I was all but certain that I had picked them up in the proper order. it just so happens that this number 3 rib has a slightly different rivet pattern that the rest of the ribs. SO once I switched the #3 and #4 ribs to the proper locations, everything magically fit back together again properly, but NOT before I had removed and replaced the LE assembly on and off the wing spar about 4 times. So that was last night's big blunder:
After resolving that problem, all the ribs seemed to fit nicely in the dimples with the skin. The next step was to set my microstop countersink tool to the proper depth by testing it on some scrap pieces. it is amazing that you can set this tool to provide a countersink that is accurate to 1/64th of an inch. I put a piece of angle between 2 drill boards and marked several holes that are far enough apart for the frame of the countersink tool. then drill drilled the holes and used a rivet to check the depth.
This procedure is also perplexing to me, because I am able to set the tool so that the rivet heads do sit perfectly flush in the holes. But the problem is that every time I actually set rivets in these hole to attach parts together, the rivets seem to end up slightly proud of the top part being riveted. This happened quite a bit when I did the holes for the fuel tank nut plates long ago.
So then yo are left with a decision to make - if you should counterskink just a little bit deeper or not so that the rivet truly does end up flush. The question then becomes, how much deeper do you countersink? SO I did some tests with a few different settings and decided which one I wanted to use, and proceeded with the holes in the wing spar flanges.
The other piece of metal in the top pic was a test piece that I made with one dimple in it to check the depth against the spar flange after the countersink holes was drilled. The test is to see if the dimple fits correctly in the countersunk hole so that the skin then sits flush with the spar. My past experience with this is that the parts tend to get slammed together pretty good with you actually rivet them together, so if the trial fit with the test piece looks good then it should definitely be that way when everything actually gets riveted together.
With the depth set, I went ahead and countersunk all the spar flange holes for the LE skin. About 128 per side for the LE. I think they came out pretty good, and the real test was clecoing the LE in place again. The skin seems to butt flush against the spar flange along the entire span, so I am happy with the results.
I then match drilled the missing holes, which I will have to debur, dimple, and countersink when the LE comes off for what should be the final time.
The last thing I did was to secure the fuel tank assembly next to the LE, so that I could FINALLY match drill the joiner plate screw holes that secure the tank to the LE skin. I was a little surprised that after dimpling and securing the LE and then butting it up against the tank that the bottom side skin has a small gap, but the edges from the middle to the tip of each skin seem to match up just fine. The top side of the skin does not seem to have this gap. I was a little disappointed, because prior to dimpling the LE this joint was completely perfect, with no gap. I guess I will have to wait until I dimple the tank skin screw holes and get it ready for riveting until I will no for certain if there is still a gap there or not.
Here are the shots of the bottom and top side skins of the tank and the LE with everything tightly secured with clecoes. The holes for the screws for the fuel tank skins that attach it to the wing spar flanges are secured with #30 clecoes that go all the way through the #8 nut plates that were attached to the wing spar flanges a long time ago.
The last pic is of the end of the wing along the wing spar flange line, showing the flush fit between the LE skin and the wing spar flange. Although this pic only shows the very tip of the skin, I checked it along the entire span for both top and bottom skins, and the fit between the dimples in the skin and te countersunk holes in the spar flange seems to be good enough for me.
One last note: In order to countersink the LE attach holes in the wing spar flange, the bottom and top skins need to be removed, so that the countersink tool can rest on the spar flange properly. The bottom skins had been removed a long time ago, so that was not an issue. However, the top skins remained on to provide strength and stability to the frame. Since they needed to be dimpled anyway, I removed the top outer skin so that I could countersink the holes for the LE on that side. This was the first time I had removed the top skins in a very long time.
Next steps:
Measure and mark the cut lines and rivet/nutplate hole locations for the removable LE. Then drill #40, followed by #30 holes for the primary rivets and screw holes along the left and right edges and the top and bottom rear edges. This needs to be done with the LE secured in place.
Need to decide what to do with the Stall warning holes. IF these will be removed by cutting out the skin section that I plane to use for my removable skin, I need to do nothing. If they will remain, I need to prep them to close them up, as they will not be used for anything in my plane.
1. Match drill the joiner plate holes to #30 only. Need to be careful not to drill into the spar bars of the wing spar so a drill stop is a must have for this. You don't drill the #19 holes for the screws until AFTER you remove the assemblies from the wing spar, for the same reason.
2. Remove the LE assembly and dimple and countersink those few remaining holes after deburring them.
3. With the fuel tank and Z brackets secured to the spar, match drill the inboard fuel tank rib, baffle, and Z Bracket rivet holes.and cleco them in place. Use a long, 12 inch #30 drill bit with a drill stop securely attached to prevent drilling into the wing spar.
4. With the LE removed, you can also access the outer-most tank rib, baffle, and Z bracket holes to match drill those.and cleco them into place. Use the same drill bit as before.
5. Remove the fuel tank skin and inner ribs from the wing spar, leaving only the baffle plate and the inner and outer-most tank ribs. Then match drill the remaining inner tank rib Z bracket rivet holes through the rear baffle plate.
6. Place primer in all the countersunk holes in the wing spar flanges for the LE
7. Dimple the top outer wing skin
8. Countersink the remaining wing spar flange holes for the top outer wing skin.
9. Apply primer to those countersunk holes
10. Reattach the outer wing skin and check the fit against the spar flange.
11. Make the stiffeners for the fuel tank, match drill them and cleco to the tank skin
12. Match drill the fuel tank skin and rib holes. Disassemble and debur all holes
13. Final drill and dimple all nut plate and screw holes in the joiner plate.
14. Final drill and dimple the screw holes in the Fuel tank skins.(top and bottom)
And then I need to disassemble the LE subskin and ribs, and make the necessary cuts to the LE outer skin.
Then we go from there.
This was a bit of a chore that required me to clear away a large area of the work bench to be able to maneuver it so that each hole could be dimpled. This was complicated for me because my dimpling table is on the bench, the back side of which is right up against the wall. So this restricts my ability to position the parts and also to position myself so that I can hold and hit the ram with both hands to properly form each dimple. Since space is restricted I found that I have to get very creative about how I position myself to be able to set these dimples. Translated another way, it means that I have to bend my body in some very unnatural and uncomfortable ways to be able to do this.
SO I can tell you right now that I am not looking forward to dimpling the larger outer wing skins, and I may go ahead and try to set up a level method on the garage floor, away from the work benches, just so it will be easier to move both myself and the sink around on the dimpling table without risking throwing my back out of whack. Not fun.
The next 2 pics show my re-assembly of the LE after I got most of the skin dimpled, except for the several holes that I missed match drilling as I mentioned in my previous post. I started reassembling by clecoing the subskin to the outer skin first, just to try to align the dimples. then I decided to reattach the center ribs first, followed by the outer ribs and then finally the inner ribs. I had numbered each rib with a piece of tape to ensure that each rib was reassembled in its proper place. (Read on for a humerous blunder that I made regarding the rib position).
Some complications arose:
1. I discovered that I had not dimpled two of the forward most holes in the subskin - I just missed them after I finally decided to dimple all the holes. So I had to detach the subskin, dimple the holes, and reattach it again - more wasted time.
2. After the LE was completely reassembled, it was time to put it back on the wing spar so I could match drill the remaining skin holes to the wing spar that I missed, and to match drill the W-423 joiner plate holes for the nut plates between the fuel tank and the LE. The only problem was that when I tried to reattach the LE rear rib flanges to the main wing spar web, I would not get the clecoes inserted into the end-most holes in the #3 rib position.
I removed the LE several times trying to figure out what was wrong. the first time I thought it was excess primer in the holes, so I ran a #30 drill bit through each rib hole.Then I put it back on the wing spar, but still had the same problem. SO I took it off again. This time I noticed that one of the rear rib flanges had 2 extra holes in it, and I remembered that one of these ribs had rear flanges that were pre-drilled from the factory, but they must have been a different hole pattern for an RV-6 or RV-7. SO for the RV-8, they tell you to match drill 2 new holes in this rib and to disregard the other holes.
It was then that I realized that I must not have the right rib in the right location. And sure enough, when I checked the rivet hole pattern for each rib flange on the main wing spar, that was exactly the problem. The funny thing is that I think I messed this up clear back to when I primed each of the LE ribs. I remember picking them up from my priming table when I was all done, and I was all but certain that I had picked them up in the proper order. it just so happens that this number 3 rib has a slightly different rivet pattern that the rest of the ribs. SO once I switched the #3 and #4 ribs to the proper locations, everything magically fit back together again properly, but NOT before I had removed and replaced the LE assembly on and off the wing spar about 4 times. So that was last night's big blunder:
After resolving that problem, all the ribs seemed to fit nicely in the dimples with the skin. The next step was to set my microstop countersink tool to the proper depth by testing it on some scrap pieces. it is amazing that you can set this tool to provide a countersink that is accurate to 1/64th of an inch. I put a piece of angle between 2 drill boards and marked several holes that are far enough apart for the frame of the countersink tool. then drill drilled the holes and used a rivet to check the depth.
This procedure is also perplexing to me, because I am able to set the tool so that the rivet heads do sit perfectly flush in the holes. But the problem is that every time I actually set rivets in these hole to attach parts together, the rivets seem to end up slightly proud of the top part being riveted. This happened quite a bit when I did the holes for the fuel tank nut plates long ago.
So then yo are left with a decision to make - if you should counterskink just a little bit deeper or not so that the rivet truly does end up flush. The question then becomes, how much deeper do you countersink? SO I did some tests with a few different settings and decided which one I wanted to use, and proceeded with the holes in the wing spar flanges.
The other piece of metal in the top pic was a test piece that I made with one dimple in it to check the depth against the spar flange after the countersink holes was drilled. The test is to see if the dimple fits correctly in the countersunk hole so that the skin then sits flush with the spar. My past experience with this is that the parts tend to get slammed together pretty good with you actually rivet them together, so if the trial fit with the test piece looks good then it should definitely be that way when everything actually gets riveted together.
With the depth set, I went ahead and countersunk all the spar flange holes for the LE skin. About 128 per side for the LE. I think they came out pretty good, and the real test was clecoing the LE in place again. The skin seems to butt flush against the spar flange along the entire span, so I am happy with the results.
I then match drilled the missing holes, which I will have to debur, dimple, and countersink when the LE comes off for what should be the final time.
The last thing I did was to secure the fuel tank assembly next to the LE, so that I could FINALLY match drill the joiner plate screw holes that secure the tank to the LE skin. I was a little surprised that after dimpling and securing the LE and then butting it up against the tank that the bottom side skin has a small gap, but the edges from the middle to the tip of each skin seem to match up just fine. The top side of the skin does not seem to have this gap. I was a little disappointed, because prior to dimpling the LE this joint was completely perfect, with no gap. I guess I will have to wait until I dimple the tank skin screw holes and get it ready for riveting until I will no for certain if there is still a gap there or not.
Here are the shots of the bottom and top side skins of the tank and the LE with everything tightly secured with clecoes. The holes for the screws for the fuel tank skins that attach it to the wing spar flanges are secured with #30 clecoes that go all the way through the #8 nut plates that were attached to the wing spar flanges a long time ago.
The last pic is of the end of the wing along the wing spar flange line, showing the flush fit between the LE skin and the wing spar flange. Although this pic only shows the very tip of the skin, I checked it along the entire span for both top and bottom skins, and the fit between the dimples in the skin and te countersunk holes in the spar flange seems to be good enough for me.
One last note: In order to countersink the LE attach holes in the wing spar flange, the bottom and top skins need to be removed, so that the countersink tool can rest on the spar flange properly. The bottom skins had been removed a long time ago, so that was not an issue. However, the top skins remained on to provide strength and stability to the frame. Since they needed to be dimpled anyway, I removed the top outer skin so that I could countersink the holes for the LE on that side. This was the first time I had removed the top skins in a very long time.
Next steps:
Measure and mark the cut lines and rivet/nutplate hole locations for the removable LE. Then drill #40, followed by #30 holes for the primary rivets and screw holes along the left and right edges and the top and bottom rear edges. This needs to be done with the LE secured in place.
Need to decide what to do with the Stall warning holes. IF these will be removed by cutting out the skin section that I plane to use for my removable skin, I need to do nothing. If they will remain, I need to prep them to close them up, as they will not be used for anything in my plane.
1. Match drill the joiner plate holes to #30 only. Need to be careful not to drill into the spar bars of the wing spar so a drill stop is a must have for this. You don't drill the #19 holes for the screws until AFTER you remove the assemblies from the wing spar, for the same reason.
2. Remove the LE assembly and dimple and countersink those few remaining holes after deburring them.
3. With the fuel tank and Z brackets secured to the spar, match drill the inboard fuel tank rib, baffle, and Z Bracket rivet holes.and cleco them in place. Use a long, 12 inch #30 drill bit with a drill stop securely attached to prevent drilling into the wing spar.
4. With the LE removed, you can also access the outer-most tank rib, baffle, and Z bracket holes to match drill those.and cleco them into place. Use the same drill bit as before.
5. Remove the fuel tank skin and inner ribs from the wing spar, leaving only the baffle plate and the inner and outer-most tank ribs. Then match drill the remaining inner tank rib Z bracket rivet holes through the rear baffle plate.
6. Place primer in all the countersunk holes in the wing spar flanges for the LE
7. Dimple the top outer wing skin
8. Countersink the remaining wing spar flange holes for the top outer wing skin.
9. Apply primer to those countersunk holes
10. Reattach the outer wing skin and check the fit against the spar flange.
11. Make the stiffeners for the fuel tank, match drill them and cleco to the tank skin
12. Match drill the fuel tank skin and rib holes. Disassemble and debur all holes
13. Final drill and dimple all nut plate and screw holes in the joiner plate.
14. Final drill and dimple the screw holes in the Fuel tank skins.(top and bottom)
And then I need to disassemble the LE subskin and ribs, and make the necessary cuts to the LE outer skin.
Then we go from there.
Wednesday, September 27, 2017
A Dimpling We WIll Go, A Dimpling We Will Go......
High Ho the Dario a dimpling we will go.....
Just couldn't resist that. As promised, I made what - for me - was substantial progress tonight. I managed to do the following in a couple hours time. All dimpling was performed with the handheld pneumatic squeezer (or heavy SOB as I like to call it), using the -3 dimple dies and the flange yoke:
1. Cleaned the dust off of the rear baffle plate of my Left Wing Fuel Tank Baffle assembly.
2. Removed and dimpled all remaining LE ribs
3. Dimpled the inboard and outboard LE rib holes in the outer skin
4. Dimpled the patch plate and access panel holes in the bottom of the outer skin
5. Verified my temporary installation of Z brackets for the fuel tank were still installed correctly on the wing spar, just as they were back in 2014 when I last touched them.
6. Re-measured the location of the bolt holes in each flange of the Z-Brackets that mounts to the main wing spar web. I reviewed an old post of mine the other day from back in 2014 were I was trying to apply Checkoway's advice to drill the initial bolt holes slightly off center. This was supposed to serve 2 purposes - to allow clearance for the most inboard Z brackets bolt heads so that a wrench or socket could fit around the bolt without interfering with the Z bracket web, and simultaneously allow a little more space for the AN470-4 rivets and Pop rivets to be applied with a rivet set and a pop rivet puller tool, also without interfering as much with the Z bracket web.
These rivets attach the opposite flange of each Z bracket to the back of the fuel tank baffle plate to complete the fuel tank installation. From researching Checkoway's posts further, it looks like you still have to grind away part of a rivet set or pop rivet tool to set those rivets, even if you make the 1/16th of an inch adjustment from center when you measure the location of each hole.
The problem with this approach was trying to figure out how to measure the lengths and widths of each Z bracket flange properly, because of the odd way that these Z-shaped aluminum extrusions were formed. From looking at the bolt holes that I drilled previously, it looks like I was using a flange width of 20/32 of an inch, or 10/16ths, or 5/8ths of an inch, as measured from the flat outer side of each flange. This means that this measurement would include the thickness of about 1/16th of an inch for the web of each Z bracket.
So the middle measurement would then be 10/32nds of an inch, or 5/16ths.
Then a 1/16th of an inch adjustment from that center mark in either direction would be 8/32nds (4/16ths or .25 inches) or 12/32nds (6/16ths or 3/8ths) of an inch, depending on which direction from the web you need to adjust. I am rehashing all of this hear so I can refer back to it as necessary when I get to the point where I need to finish drilling all the remaining holes in each Z bracket.
If I don't include the thickness of the Z bracket web in these measurements, the numbers reduce to a total flange width of 9/16ths of an inch, or 18/32s, and the halfway point would then be 4.5/16ths , or 9/32nds of an inch. Then the 1/16th of an inch adjustment to either side would be 3.5/16ths (7/32nds) or 5.5/16ths (11/32nds). Seriously, trying to figure out precisely where to drill the Z bracket flange holes is a pain in the ass, because these measurements can just drive you crazy.
When you further consider that the width of the hole you must drill for the bolts is 3/16ths of an inch, it does not leave much room to work with if you go either closer to or farther away from the web of the Z bracket. Crazy stuff. When I evaluated this situation, I realized that the "close" measurement would only leave about 1/32 if an inch from the web, and I don't think that a nut plate will fit on the flange with only that much space. So I chose to stick with the measurements that include the thickness of the web.
Then, when you finally look at the numbers, and realize that the only difference that you seem to be working with is just 1/32nd of an inch between the two different measurement methods, you realize that it probably does not make much difference either way, and you will still end up grinding away a large portion of whichever tool you need to use just to make it fit up against the Z bracket web enough to set the rivets.
7. Verified that each of the bolt holes I drilled in the left wing Z brackets appeared to be in the correct place based on the outer measurement technique. I had ordered a set of additional Z brackets after I accidentally drilling a bad hole in one of them in 2014, and I still have those spares today, just in case I need to re-drill any of them.
8. Dimpled the holes along the bottom edge of the Le outer skin. Unfortunately, I found out while doing this that I had missed the match drilling of several holes on both the top and bottom side of the rear of the LE skin where it gets riveted onto each spar flange. What this means is that I cannot countersink all of the corresponding holes in the main wing spar flange, because some of them still have to be match drilled first. Since I know I have to remove the LE one last time before it gets attached to the wing for good, this is fine.
I will match drill the missed holes through the LE skin and the wing spar flanges, and then after the LE comes back off for the last time I will debur and dimple the remaining holes in the skin, and countersink the remaining matching holes in the wing spar flanges. So this is not that big of a deal, but I am bit surprised that I missed so many holes. Sure hope I did better on the right wing.
9. As I expected, when I dimpled the inboard rivet holes with the 426-3 dimple die in the outer LE skin, where the first inboard rib is located, there was one hole that was wallowed out pretty badly - so badly in fact that I am not sure if a -4 rivet will set in this hole correctly, but it is too early to tell just yet. Surprisingly most of the other holes that I was worried about seemed to have made a pretty good dimple. The acid test will come when I get ready to try to drive a rivet in these holes.
10. The holes in the skin for the custom rib that fits next to the first inboard rib have not yet been dimpled, because I will need the dimpling table, C-Frame tool, and my close quarter dimpling tool to dimple those remaining holes in the outer skin. It was getting late, so that is where I stopped for the evening. So I won't know the status of the rivet holes in the tip of the LE skin for of this rib until I get to them tomorrow.
So the next steps are to finish dimpling the remaining rivet holes in the outer LE skin for each of the inboard LE ribs, and then get my micro-stop countersink tool out and run some test countersinks to properly set the depth, and then go to work on the main wing spar flange holes that need countersinking. I envision needing about 2-3 days to complete this work, because there are A LOT of holes to countersink. This will also leave a mess of metal, the likes of which I have not experienced since I drilled all the nut plate holes for the fuel tank.attach points in the main wing spar flanges a long time ago.
Starting to knock things out a little at a time..... Progress! Yeah!
KPR.
Just couldn't resist that. As promised, I made what - for me - was substantial progress tonight. I managed to do the following in a couple hours time. All dimpling was performed with the handheld pneumatic squeezer (or heavy SOB as I like to call it), using the -3 dimple dies and the flange yoke:
1. Cleaned the dust off of the rear baffle plate of my Left Wing Fuel Tank Baffle assembly.
2. Removed and dimpled all remaining LE ribs
3. Dimpled the inboard and outboard LE rib holes in the outer skin
4. Dimpled the patch plate and access panel holes in the bottom of the outer skin
5. Verified my temporary installation of Z brackets for the fuel tank were still installed correctly on the wing spar, just as they were back in 2014 when I last touched them.
6. Re-measured the location of the bolt holes in each flange of the Z-Brackets that mounts to the main wing spar web. I reviewed an old post of mine the other day from back in 2014 were I was trying to apply Checkoway's advice to drill the initial bolt holes slightly off center. This was supposed to serve 2 purposes - to allow clearance for the most inboard Z brackets bolt heads so that a wrench or socket could fit around the bolt without interfering with the Z bracket web, and simultaneously allow a little more space for the AN470-4 rivets and Pop rivets to be applied with a rivet set and a pop rivet puller tool, also without interfering as much with the Z bracket web.
These rivets attach the opposite flange of each Z bracket to the back of the fuel tank baffle plate to complete the fuel tank installation. From researching Checkoway's posts further, it looks like you still have to grind away part of a rivet set or pop rivet tool to set those rivets, even if you make the 1/16th of an inch adjustment from center when you measure the location of each hole.
The problem with this approach was trying to figure out how to measure the lengths and widths of each Z bracket flange properly, because of the odd way that these Z-shaped aluminum extrusions were formed. From looking at the bolt holes that I drilled previously, it looks like I was using a flange width of 20/32 of an inch, or 10/16ths, or 5/8ths of an inch, as measured from the flat outer side of each flange. This means that this measurement would include the thickness of about 1/16th of an inch for the web of each Z bracket.
So the middle measurement would then be 10/32nds of an inch, or 5/16ths.
Then a 1/16th of an inch adjustment from that center mark in either direction would be 8/32nds (4/16ths or .25 inches) or 12/32nds (6/16ths or 3/8ths) of an inch, depending on which direction from the web you need to adjust. I am rehashing all of this hear so I can refer back to it as necessary when I get to the point where I need to finish drilling all the remaining holes in each Z bracket.
If I don't include the thickness of the Z bracket web in these measurements, the numbers reduce to a total flange width of 9/16ths of an inch, or 18/32s, and the halfway point would then be 4.5/16ths , or 9/32nds of an inch. Then the 1/16th of an inch adjustment to either side would be 3.5/16ths (7/32nds) or 5.5/16ths (11/32nds). Seriously, trying to figure out precisely where to drill the Z bracket flange holes is a pain in the ass, because these measurements can just drive you crazy.
When you further consider that the width of the hole you must drill for the bolts is 3/16ths of an inch, it does not leave much room to work with if you go either closer to or farther away from the web of the Z bracket. Crazy stuff. When I evaluated this situation, I realized that the "close" measurement would only leave about 1/32 if an inch from the web, and I don't think that a nut plate will fit on the flange with only that much space. So I chose to stick with the measurements that include the thickness of the web.
Then, when you finally look at the numbers, and realize that the only difference that you seem to be working with is just 1/32nd of an inch between the two different measurement methods, you realize that it probably does not make much difference either way, and you will still end up grinding away a large portion of whichever tool you need to use just to make it fit up against the Z bracket web enough to set the rivets.
7. Verified that each of the bolt holes I drilled in the left wing Z brackets appeared to be in the correct place based on the outer measurement technique. I had ordered a set of additional Z brackets after I accidentally drilling a bad hole in one of them in 2014, and I still have those spares today, just in case I need to re-drill any of them.
8. Dimpled the holes along the bottom edge of the Le outer skin. Unfortunately, I found out while doing this that I had missed the match drilling of several holes on both the top and bottom side of the rear of the LE skin where it gets riveted onto each spar flange. What this means is that I cannot countersink all of the corresponding holes in the main wing spar flange, because some of them still have to be match drilled first. Since I know I have to remove the LE one last time before it gets attached to the wing for good, this is fine.
I will match drill the missed holes through the LE skin and the wing spar flanges, and then after the LE comes back off for the last time I will debur and dimple the remaining holes in the skin, and countersink the remaining matching holes in the wing spar flanges. So this is not that big of a deal, but I am bit surprised that I missed so many holes. Sure hope I did better on the right wing.
9. As I expected, when I dimpled the inboard rivet holes with the 426-3 dimple die in the outer LE skin, where the first inboard rib is located, there was one hole that was wallowed out pretty badly - so badly in fact that I am not sure if a -4 rivet will set in this hole correctly, but it is too early to tell just yet. Surprisingly most of the other holes that I was worried about seemed to have made a pretty good dimple. The acid test will come when I get ready to try to drive a rivet in these holes.
10. The holes in the skin for the custom rib that fits next to the first inboard rib have not yet been dimpled, because I will need the dimpling table, C-Frame tool, and my close quarter dimpling tool to dimple those remaining holes in the outer skin. It was getting late, so that is where I stopped for the evening. So I won't know the status of the rivet holes in the tip of the LE skin for of this rib until I get to them tomorrow.
So the next steps are to finish dimpling the remaining rivet holes in the outer LE skin for each of the inboard LE ribs, and then get my micro-stop countersink tool out and run some test countersinks to properly set the depth, and then go to work on the main wing spar flange holes that need countersinking. I envision needing about 2-3 days to complete this work, because there are A LOT of holes to countersink. This will also leave a mess of metal, the likes of which I have not experienced since I drilled all the nut plate holes for the fuel tank.attach points in the main wing spar flanges a long time ago.
Starting to knock things out a little at a time..... Progress! Yeah!
KPR.
Research of Checkoway Method for Fuel Tank Frame and LE Mod Remaining Steps
Spent several hours revisiting Dan Checkoway's method for ensuring a proper fit of the fuel tank skin against the LE skin. I also reviewed my own blog from about 3 years ago in 2014 when I was on the path of "normalcy" with this project until I decided to do the LE mod. I had to stop at the point where I normally would have been ready to drill and assemble the fuel tank frame, finish constructing the LE, and moved on to the ailerons and flaps and push rods, like everyone else. Instead, everything stopped at the point where I would have completed the LE.
This is next pic is a subtle reminder of that fact.
Had I decided to do the "normal" thing like everyone else, there would have been no custom-built ribs, no subskin, no patch plate, and instead of the subskin all I would have had to do is install the small square mounting bracket for the access panel. That small square bracket is all I would have had to mount to the outer skin of the LE. There would have been no additional holes to measure and drill, and I am pretty sure that I would have both wings done by now and I would be in the middle of my fuselage. Pretty amazing to think that this small number of customized parts would cause such delays in the building progress.
I am now on what was supposed to be the "hard" part of the modification - figuring out exactly how to measure, cut, and secure the detachable leading edge. I need to figure out the exact placement of all the rivets and nut plates, and then finally take the plunge and make the dreaded cuts of the LE skin.
Before I do that, however, I need to finish dimpling the LE outer skin and remaining ribs, and then I need to countersink a lot of holes in the Main wing spar flanges for the top and bottom mounting holes of the LE skin to the spar. When that is done I can reassemble the LE using the cradle and the table with clecoes, mark the cut lines and rivet and screw holes in the outer skin and subskin, attach it to the main wing spar again, drill the rivet and screw holes for the removable LE, fit the Fuel tank to the wing spar, verify the fit of the tank and the LE skins, drill the inboard Z Bracket rivet holes per the Checkoway procedure, drill the Fuel Tank to LE joiner plate screw and nut plate holes, remove the LE, finish drilling the outboard Fuel tank rib to baffle holes, disassemble the fuel tank skin, finish drilling the remaining fuel tank rib to baffle to Z Bracket holes for the interior fuel tank ribs and Z brackets, disassemble the fuel tank frame, cut the LE outer skin to the predetermined cut lines, fabricate a new removeable LE skin to replace the skin that was cut away from the LE, disassemble the LE ribs and subskin for what should be the very last time, debur and smooth all holes and edges in outer skin and subskin, drill, debur,and dimple all subskin holes and edges, rivet all nut plates in the subskin, drill, debur, and dimple the screw holes in the removeable LE skin in a wrapping and forming procedure to ensure that the removeable skin adheres to the LE shape and dimension with the surrounding outer skin, rivet the LE ribs to the outer skin and subskin, reattach the LE to the wing spar, and finally, rivet the LE to the wing spar (both ribs and skins).
WOW! And I thought I was making "progress!" then, once this is all done, I can 3D all the remaining fuel tank ribs, skins, baffle plate, and fabricate the tank stiffeners. Then I can proceed with the 6 million things you need to do to finish the fuel tanks. Somewhere in between all that I can finally dimple the top wing skins and main wing ribs.
Just a few things left to do until I can finally play with proseal!
Now that I have few more things figured out, progress continues tomorrow.
KPR
This is next pic is a subtle reminder of that fact.
Had I decided to do the "normal" thing like everyone else, there would have been no custom-built ribs, no subskin, no patch plate, and instead of the subskin all I would have had to do is install the small square mounting bracket for the access panel. That small square bracket is all I would have had to mount to the outer skin of the LE. There would have been no additional holes to measure and drill, and I am pretty sure that I would have both wings done by now and I would be in the middle of my fuselage. Pretty amazing to think that this small number of customized parts would cause such delays in the building progress.
I am now on what was supposed to be the "hard" part of the modification - figuring out exactly how to measure, cut, and secure the detachable leading edge. I need to figure out the exact placement of all the rivets and nut plates, and then finally take the plunge and make the dreaded cuts of the LE skin.
Before I do that, however, I need to finish dimpling the LE outer skin and remaining ribs, and then I need to countersink a lot of holes in the Main wing spar flanges for the top and bottom mounting holes of the LE skin to the spar. When that is done I can reassemble the LE using the cradle and the table with clecoes, mark the cut lines and rivet and screw holes in the outer skin and subskin, attach it to the main wing spar again, drill the rivet and screw holes for the removable LE, fit the Fuel tank to the wing spar, verify the fit of the tank and the LE skins, drill the inboard Z Bracket rivet holes per the Checkoway procedure, drill the Fuel Tank to LE joiner plate screw and nut plate holes, remove the LE, finish drilling the outboard Fuel tank rib to baffle holes, disassemble the fuel tank skin, finish drilling the remaining fuel tank rib to baffle to Z Bracket holes for the interior fuel tank ribs and Z brackets, disassemble the fuel tank frame, cut the LE outer skin to the predetermined cut lines, fabricate a new removeable LE skin to replace the skin that was cut away from the LE, disassemble the LE ribs and subskin for what should be the very last time, debur and smooth all holes and edges in outer skin and subskin, drill, debur,and dimple all subskin holes and edges, rivet all nut plates in the subskin, drill, debur, and dimple the screw holes in the removeable LE skin in a wrapping and forming procedure to ensure that the removeable skin adheres to the LE shape and dimension with the surrounding outer skin, rivet the LE ribs to the outer skin and subskin, reattach the LE to the wing spar, and finally, rivet the LE to the wing spar (both ribs and skins).
WOW! And I thought I was making "progress!" then, once this is all done, I can 3D all the remaining fuel tank ribs, skins, baffle plate, and fabricate the tank stiffeners. Then I can proceed with the 6 million things you need to do to finish the fuel tanks. Somewhere in between all that I can finally dimple the top wing skins and main wing ribs.
Just a few things left to do until I can finally play with proseal!
Now that I have few more things figured out, progress continues tomorrow.
KPR
Labels:
Fuel Tanks,
Special Project,
Wing Leading Edge,
Wings
Sunday, September 24, 2017
More Dimpling and Resetting Bad Rivets in the Subskin
Today I dimpled the holes in the two inboard ribs with the pneumatic squeezer. I also drilled out and re-set about 5 nut plate rivets as I described in the previous post. That was relatively uneventful, and although I did not go through the same agony of clamping blocks like I did before, I did still have to come up with ways to secure the skin to drill out the rivets. When I set the new ones I simply held it in my hand on the workbench, with my fingers close enough to provide good resistance for the rivet set.
I decided to go ahead and dimple all the rivet holes in the subskin and the ribs. I did NOT leave the 2 most forward rivet holes alone as I previously indicated that I might do. I decided that the hole integrity is good for a 3/32 dimple and rivet on both of those parts, so I will see how the outer skin dimple situation goes when the time comes with those wallowed out oversized holes. Email will go to Vans tomorrow to ask if I can increase to an AN426AD-4 rivet if necessary to provide the correct grip for the LE outer skin holes.
Then I scuffed, cleaned and primed the access panel and permanent patch plate with NAPA 7220 self-etching primer.The weather around here is really cold and rainy, and my primer is extremely old as well, so I wasn't sure if it would apply properly or not, with all the high humidity, etc. After letting it dry it seems like it applied OK, so I will go with it for now.
I set one rivet in the wrong hole the other day, and so that one just had to be removed. However, when I checked the dimple one side had been crushed just a bit, so I took the time to clear the bench and set up the C-Frame again to try to reform the dimple a bit. that did not really seem to make much difference, but at least I tried. The hole in question attaches the outer LE skin to the subskin. It would have matched a similar hole in the new access panel's mounting bracket had I used that. Since i am using the subskin for that purpose, that hole won't be riveted until I am ready to secure the entire subskin to the outer skin.
For the rest of the day I studied the Fuel Tank instructions and diagrams to re-acclimate myself to the tank part numbers and assembly sequences. More on that in the posts for next week...
Winter is coming - and I still need heat in my garage....
No pics tonight.
KPR
I decided to go ahead and dimple all the rivet holes in the subskin and the ribs. I did NOT leave the 2 most forward rivet holes alone as I previously indicated that I might do. I decided that the hole integrity is good for a 3/32 dimple and rivet on both of those parts, so I will see how the outer skin dimple situation goes when the time comes with those wallowed out oversized holes. Email will go to Vans tomorrow to ask if I can increase to an AN426AD-4 rivet if necessary to provide the correct grip for the LE outer skin holes.
Then I scuffed, cleaned and primed the access panel and permanent patch plate with NAPA 7220 self-etching primer.The weather around here is really cold and rainy, and my primer is extremely old as well, so I wasn't sure if it would apply properly or not, with all the high humidity, etc. After letting it dry it seems like it applied OK, so I will go with it for now.
I set one rivet in the wrong hole the other day, and so that one just had to be removed. However, when I checked the dimple one side had been crushed just a bit, so I took the time to clear the bench and set up the C-Frame again to try to reform the dimple a bit. that did not really seem to make much difference, but at least I tried. The hole in question attaches the outer LE skin to the subskin. It would have matched a similar hole in the new access panel's mounting bracket had I used that. Since i am using the subskin for that purpose, that hole won't be riveted until I am ready to secure the entire subskin to the outer skin.
For the rest of the day I studied the Fuel Tank instructions and diagrams to re-acclimate myself to the tank part numbers and assembly sequences. More on that in the posts for next week...
Winter is coming - and I still need heat in my garage....
No pics tonight.
KPR
Saturday, September 23, 2017
Pounded Some Access Panel Nut Plate Rivets
As I mentioned in the previous post, the "act" of setting rivets turns into an artistic, creative adventure that involves trying to figure out how to clamp and secure very odd-shaped parts. I had to dig into my stash supply of wood to come up with an acceptable method for doing so. The pics that follow show how this was done. The basic problem was trying to setup the subskin in such a way that it allowed me handle the rivet squeezer and the part at the same time with both hands. i had to get the subskin at the right height compared to the surrounding wood clamps so that both sides of the squeezer would fit on either side of the subskin without interfering with the wood or the clamps.
The best method I have found for this, mostly since the squeezer is such a damn heavy tool, is to secure the part so that I can use my left hand to steady the yoke and rivet set against the manufactured rivet head so that I know that it is flush with the skin, and hold the squeezer in my right hand. To do this, I have to make sure that the clamping method both secures the skin so that it will not move when I apply the squeezer, and at the same time the clamping solution has to allow enough room for the big-ass squeezer body on the other side of the skin. This is not an easy task when dealing with pre-bent skins, but can be done successfully if you put enough time and thought into how to do this correctly.
For tools I used the pneumatic squeezer with air pressure set to 90 psi, and I used the flange yoke to allow it to fit inside the access panel hole and fit the rivet set as easily as possible. I also used 2 1/2 inch x 1/8 inch flat rivet sets on the top and bottom of the yoke.
This first pic is my initial clamping setup to start setting the bottom row of nut plates. Note the mixture of wood pieces I had to use. I was too lazy to trim the wood to exacting sizes. I just worked with what I had available. This side has enough clearance for the rivet set on the top end of the yoke on the squeezer, so that the rivet set can be centered on the manufactured head of the rivet.
And the back side, which had to be somewhat lower than the other side to allow room for the squeezer body:
Notice how I used the end-piece of each clamp on this side, once again to allow as much room for the squeezer body as possible so that it will no interfere with the clamps. I have screwed up more than one rivet in the past because the squeezer ends up hitting either a clamp, the part, or some wood, while in the process of squeezing the rivet. This is why you spend more time setting up the clamping solution than setting the rivets. Some people my even consider this a "simple" operation and probably would have held the part in their hands to set the rivets. Not me. This is always a time consuming, agonizing process for me, but the outcome usually justifies the means for me, since I usually do not have to reset very many rivets after taking the time to set this up correctly.
The next pics show the setup for each nut plate. One cleco on one side and the NAS 1097 3.5 rivet in the other hole:
And here is a pic of the Squeezer setup. The other thing you have to do is adjust the ram of the squeezer so that it sets the rivet properly so that the shop head is 1.5 x the diameter of the rivet shaft, and has the proper height, etc. the very first rivet is always an experiment, unless you take the time to setup a practice piece with all the same dimensions as the actual part, so you can set it up that way. Otherwise, what I usually do is take a rivet and then activate and hold the squeezer in its compressed state, and place the rivet next to the rivet set to determine if the gap is correct or not. I usually start so that the rivet will not set quite all the way at first. Then I will set the rivet and note the result, and then readjust the ram height accordingly and re-squeeze the rivet one or tow more times until the squeezer is set exactly as it should be for the remaining rivets. In other words, I "creep" up on the proper setting of the ram. Better to be too shallow at first than too close with the ram.
Next is the hard part of setting the rivet. I don't have enough hands to hold a camera and perform the operation at the same time, so all you get here is the aftermath. One properly set rivet down, several more to go. the trick for this with nut plates is making sure that the rivet set will clear the screw shaft of the nut plate, and still make full, flat contact with the rivet shaft so that the shop head is formed nice and flat against the nut plate flange. This is where the heavy squeezer and sometimes awkward positioning of the squeezer make this feat next to impossible sometimes.
So you position the top of the yoke against the manufactured head, hold that part of the yoke against the skin and apply a little pressure with your left hand, and position the squeezer with your right hand so that the rivet set is perfectly perpendicular with the rivet shaft. Then you hit the trigger and pray that it all comes out good. Centering the rivet set against the manufactured head is always the challenge.
As a footnote, you always have better control during the entire squeezing operation by using a hand squeezer instead of the standard pneumatic one. The only way that this tool would have worked in this situation is by positioning it so that the flat rivet set against the manufactured head would have been on the moving ram, and this is just something I try to avoid at all costs, because it is tricky at best to try to keep the rivet set on the end of a moving ram in place without it moving somewhat. The handles would not fit in between the curved skins, which it what I needed in order to make the hand squeezer work the way that I would want it to.
And after the second rivet is set, you get this blurry pic:
And the other side
And here is a rare pic of yours truly performing the positioning exercise previously described/ You'll need to note that I have turned the part around and rearranged the clamps and wood blocks to allow riveting the nut plates along the remaining edges. Like I said - you have to get creative sometimes:
And here are the results after the job was "done." Truth be told, even after all this prep, I ended up with about 5 rivets that I was not happy with. Three of them I was able to "coax" into position with a punch and hammer to get the manufactured head to sit a bit more flush against the skin than they turned out with the squeezer. It was that perception problem I described earlier where, despite your best efforts, sometimes you just can't tell very easily if the rivet set is flush and flat against the skin, and you end up with a slightly raised rivet head. Flush rivets need to be just that - flush - against the skin. So you either drill them out and reset them or sometimes you can pound them a little to force them further down into the countersunk hole.
I have no choice but to reset the other two rivets because one of them was inserted into the wrong rivet hole, and the other one was a 1097 rivet inserted into that one hole that mentioned in previous posts that I had to countersink for the larger AN426AD3.5 rivet. IOW I put the smaller rivet head in the hole with the larger countersink, so that one has to be drilled out and replaced with the correct rivet.
After all the rivets were set, I wanted to pre-set the #8 screws into each nut plate. I took some Boe lube ad ran the threads of each screw into that to coat them with this lubricant. I did this in lieu of taking a tap and running that through each nut plate. There is a lot of discussion about this on the forums. The problem is that all nut plates are set to be very very tight, and this is by design. Unfortunately, this makes it very hard to turn the screws.
The rule is:
If it is a structural or otherwise crucial attachment that requires a specific torque or must remain tight for structural reasons, you do NOT run a tap through the nut plate. Instead, the preferred method is to use a lubricant like Boe lube on the screw threads, and this does a great job of allowing the screws to be threaded onto the nut plate much easier, without compromising gripping strength.
Otherwise if there are no structural concerns, such as for access panels or floor boards or other compartments, you can run a tap through the nut plate if you wish. Just know that this effectively removes par of the threads in the nut plate and re-forms and loosens the hole just. SO pick your poison and realize the consequences.
All the screws went on as expected, and even with some of my less-than-perfect rivets, the access panel fits nice and flat up against the subskin, so I was happy about that.
Next steps are to drill out and reset those two remaining rivets, and then scuff, clean and prime the patch plate and the access panel.Then I dimple the ribs and the outer skin and figure out what to do about the wallowed out holes in the outer LE skin. I plan to call Vans about that on Monday because I just discovered that I have some AN426AD-4 1/8 inch rivets that I think I can use in those first couple of holes if the outer skin is too messed up for a -3 rivet.
Pounding rivets was challenging but fun. Only about 12,000 more to go.......
KPR
The best method I have found for this, mostly since the squeezer is such a damn heavy tool, is to secure the part so that I can use my left hand to steady the yoke and rivet set against the manufactured rivet head so that I know that it is flush with the skin, and hold the squeezer in my right hand. To do this, I have to make sure that the clamping method both secures the skin so that it will not move when I apply the squeezer, and at the same time the clamping solution has to allow enough room for the big-ass squeezer body on the other side of the skin. This is not an easy task when dealing with pre-bent skins, but can be done successfully if you put enough time and thought into how to do this correctly.
For tools I used the pneumatic squeezer with air pressure set to 90 psi, and I used the flange yoke to allow it to fit inside the access panel hole and fit the rivet set as easily as possible. I also used 2 1/2 inch x 1/8 inch flat rivet sets on the top and bottom of the yoke.
This first pic is my initial clamping setup to start setting the bottom row of nut plates. Note the mixture of wood pieces I had to use. I was too lazy to trim the wood to exacting sizes. I just worked with what I had available. This side has enough clearance for the rivet set on the top end of the yoke on the squeezer, so that the rivet set can be centered on the manufactured head of the rivet.
And the back side, which had to be somewhat lower than the other side to allow room for the squeezer body:
Notice how I used the end-piece of each clamp on this side, once again to allow as much room for the squeezer body as possible so that it will no interfere with the clamps. I have screwed up more than one rivet in the past because the squeezer ends up hitting either a clamp, the part, or some wood, while in the process of squeezing the rivet. This is why you spend more time setting up the clamping solution than setting the rivets. Some people my even consider this a "simple" operation and probably would have held the part in their hands to set the rivets. Not me. This is always a time consuming, agonizing process for me, but the outcome usually justifies the means for me, since I usually do not have to reset very many rivets after taking the time to set this up correctly.
The next pics show the setup for each nut plate. One cleco on one side and the NAS 1097 3.5 rivet in the other hole:
And here is a pic of the Squeezer setup. The other thing you have to do is adjust the ram of the squeezer so that it sets the rivet properly so that the shop head is 1.5 x the diameter of the rivet shaft, and has the proper height, etc. the very first rivet is always an experiment, unless you take the time to setup a practice piece with all the same dimensions as the actual part, so you can set it up that way. Otherwise, what I usually do is take a rivet and then activate and hold the squeezer in its compressed state, and place the rivet next to the rivet set to determine if the gap is correct or not. I usually start so that the rivet will not set quite all the way at first. Then I will set the rivet and note the result, and then readjust the ram height accordingly and re-squeeze the rivet one or tow more times until the squeezer is set exactly as it should be for the remaining rivets. In other words, I "creep" up on the proper setting of the ram. Better to be too shallow at first than too close with the ram.
Next is the hard part of setting the rivet. I don't have enough hands to hold a camera and perform the operation at the same time, so all you get here is the aftermath. One properly set rivet down, several more to go. the trick for this with nut plates is making sure that the rivet set will clear the screw shaft of the nut plate, and still make full, flat contact with the rivet shaft so that the shop head is formed nice and flat against the nut plate flange. This is where the heavy squeezer and sometimes awkward positioning of the squeezer make this feat next to impossible sometimes.
So you position the top of the yoke against the manufactured head, hold that part of the yoke against the skin and apply a little pressure with your left hand, and position the squeezer with your right hand so that the rivet set is perfectly perpendicular with the rivet shaft. Then you hit the trigger and pray that it all comes out good. Centering the rivet set against the manufactured head is always the challenge.
As a footnote, you always have better control during the entire squeezing operation by using a hand squeezer instead of the standard pneumatic one. The only way that this tool would have worked in this situation is by positioning it so that the flat rivet set against the manufactured head would have been on the moving ram, and this is just something I try to avoid at all costs, because it is tricky at best to try to keep the rivet set on the end of a moving ram in place without it moving somewhat. The handles would not fit in between the curved skins, which it what I needed in order to make the hand squeezer work the way that I would want it to.
And after the second rivet is set, you get this blurry pic:
And the other side
And here is a rare pic of yours truly performing the positioning exercise previously described/ You'll need to note that I have turned the part around and rearranged the clamps and wood blocks to allow riveting the nut plates along the remaining edges. Like I said - you have to get creative sometimes:
And here are the results after the job was "done." Truth be told, even after all this prep, I ended up with about 5 rivets that I was not happy with. Three of them I was able to "coax" into position with a punch and hammer to get the manufactured head to sit a bit more flush against the skin than they turned out with the squeezer. It was that perception problem I described earlier where, despite your best efforts, sometimes you just can't tell very easily if the rivet set is flush and flat against the skin, and you end up with a slightly raised rivet head. Flush rivets need to be just that - flush - against the skin. So you either drill them out and reset them or sometimes you can pound them a little to force them further down into the countersunk hole.
I have no choice but to reset the other two rivets because one of them was inserted into the wrong rivet hole, and the other one was a 1097 rivet inserted into that one hole that mentioned in previous posts that I had to countersink for the larger AN426AD3.5 rivet. IOW I put the smaller rivet head in the hole with the larger countersink, so that one has to be drilled out and replaced with the correct rivet.
After all the rivets were set, I wanted to pre-set the #8 screws into each nut plate. I took some Boe lube ad ran the threads of each screw into that to coat them with this lubricant. I did this in lieu of taking a tap and running that through each nut plate. There is a lot of discussion about this on the forums. The problem is that all nut plates are set to be very very tight, and this is by design. Unfortunately, this makes it very hard to turn the screws.
The rule is:
If it is a structural or otherwise crucial attachment that requires a specific torque or must remain tight for structural reasons, you do NOT run a tap through the nut plate. Instead, the preferred method is to use a lubricant like Boe lube on the screw threads, and this does a great job of allowing the screws to be threaded onto the nut plate much easier, without compromising gripping strength.
Otherwise if there are no structural concerns, such as for access panels or floor boards or other compartments, you can run a tap through the nut plate if you wish. Just know that this effectively removes par of the threads in the nut plate and re-forms and loosens the hole just. SO pick your poison and realize the consequences.
All the screws went on as expected, and even with some of my less-than-perfect rivets, the access panel fits nice and flat up against the subskin, so I was happy about that.
Next steps are to drill out and reset those two remaining rivets, and then scuff, clean and prime the patch plate and the access panel.Then I dimple the ribs and the outer skin and figure out what to do about the wallowed out holes in the outer LE skin. I plan to call Vans about that on Monday because I just discovered that I have some AN426AD-4 1/8 inch rivets that I think I can use in those first couple of holes if the outer skin is too messed up for a -3 rivet.
Pounding rivets was challenging but fun. Only about 12,000 more to go.......
KPR
Labels:
Building Tips and Tricks,
Clamping,
Riveting,
Wing Leading Edge,
Wings
Subscribe to: