A bad pic of the center bearing hanging up on my painting booth hanger (a strand of aluminum wire that I removed from the garage when I wired in a new circuit for the high powered tools to keep them separate from the lights.) It is long enough to string across the garage by attaching it to the shelf brackets on one side and another shelf bracket on the opposite side of the garage. Although hard to see - it has been sprayed with the primer, and the center part has been masked over with frog tape. It is hanging from another piece of copper wire - remnant from the new electrical circuit mentioned previously. This works pretty well for me as a painting platform. I need to get some more flood lamps to add much needed light.
This site was created to provide friends and family with a vehicle to track my efforts to build a Van's RV 8 Aircraft kit. The dream began in the Summer of 2008. The actual building began in 2009, with the arrival of the empennage or tail kit. I will periodically update the site with photos and comments about my progress.
Thursday, October 22, 2009
First 7220 Self Etching NAPA Primer sprayed on HS Center Bearing
A bad pic of the center bearing hanging up on my painting booth hanger (a strand of aluminum wire that I removed from the garage when I wired in a new circuit for the high powered tools to keep them separate from the lights.) It is long enough to string across the garage by attaching it to the shelf brackets on one side and another shelf bracket on the opposite side of the garage. Although hard to see - it has been sprayed with the primer, and the center part has been masked over with frog tape. It is hanging from another piece of copper wire - remnant from the new electrical circuit mentioned previously. This works pretty well for me as a painting platform. I need to get some more flood lamps to add much needed light.
No comments:
Post a Comment