- Add a new 20 amp electrical circuit to isolate the air compressor from the rest of the lights and outlets in the garage - no more dimming lights when the compressor kicks on!
- Added 3 new outlets on the new electrical circuit, and extended 3 more outlets from an existing circuit, all paced strategically above the workbenches.
- Rewired an incorrectly wired three way switch to make it work like a true three way switch ( was actually a 2-way,three-way switch.....too hard to explain!)
- Built 2 seven-foot long work benches
- Added a large utility storage shelf unit - 2ft x 4ft x 6ft tall.
- Put up peg board sections above work benches
- Hung 2 new shop lights above each work bench
- Removed all traces of old aluminum wiring from the garage. There were 2 very long runs of very large aluminum wiring very high in the rafters that had to be removed and replaced with copper wiring.
- Rewired and reposition a phone line.
This site was created to provide friends and family with a vehicle to track my efforts to build a Van's RV 8 Aircraft kit. The dream began in the Summer of 2008. The actual building began in 2009, with the arrival of the empennage or tail kit. I will periodically update the site with photos and comments about my progress.
Wednesday, May 27, 2009
Workshop objectives completed
Just to be certain that have actually accomplished some things over the past several weeks, here is a list of the jobs that I set out to complete in the garage before I would be allowed (by my lovely wife) to order my RV 8 tail kit from Van's: